- Natural Channel Improvements
|
|
|
|
|
|
|
|
- Box & Round Pipelines to 96"
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WEI
has designed drainage conveyance facilites ranging from detailed onsite
systems, including roof drains and parking and landscaping areas, to large
round and box section pipelines and inverted siphons up to 96 inches. Designs
include hydraulic channels, both man-made and natural channel conveyance,
erosion, and stability improvements, box culverts and bridges, along with
associated hydraulic structures and erosion protection. Special attention is
given to materials and construction characteristics, adequate flow velocities,
erosion and scour, water quality, aesthetics, functionality, cost, and
maintenance.
|
|
|
|
|
|
|
|
|
Mesa County Fairgrounds Drainage Improvements: Phases 1 & 2, Mesa County, CO Design involved approximately 4500 LF storm drain up to 24" in diameter, 30 inlets, and 42 connections to roof drains at County Fairgrounds.
32.5 Rd. Storm Drain, Mesa County, CO Design of 2000 lineal feet of 36 inch storm drain, with many conflictingutilities and a canal crossing. Project included replacement of a concrete ditch with a pipe irrigation system and related appurtenances.
South Avenue Reconstruction 5th St. to 9th St., Grand Junction, CO Roadway contained 24", 21", and 15" parallel combined sewers. Designed for combined sewer separation using existing lines plus new 48" storm drain. Special challenges were other utilities in the same street - two active waterlines, a medium pressure 10" gas line, 12" high pressure gas line, two banks of underground electric, overhead high voltage lines, irrigation pipeline, and underground telephone all in 80' of R.O.W.
Squaw Peak Parkway, Phoenix, AZ Performed hydraulic evaluations and designs related to truncation of existing systems caused by the proposed Squaw Peak Parkway, including pipes and siphons up to 96 inches.
|
|
|
|
|
25 Road Storm Drain, Grand Jct., CO Design Ranchmans Ditch overflow and 25 Road local area drainage system with drain pipes up to 60" in diameter.
Orchard Ave. Drain, Grand Jct., CO Analyzed drainage in the Logan Drain system, design proposed systems up to 60" outfalls.
Roadway Reconstruction & Drainage Project, Collbran, CO Design of reconstruction of over two miles of local residential streets and collectors with 27 intersections, and provide drainage improvements.
State Hwy 77, ADOT, AZ Drainage Engineer for the Showlow- Taylor project involving a 6.5 mile stretch of highway.
Butler Avenue Interchange, ADOT, AZ Design drainage system upgrade for an existing facility at Butler Avenue Interchange which was improved from two lanes to five lanes.
Redlands Grove, Mesa County, CO Evaluate and design channel for Colorado Nat'l Monument runoff through a subdivision. Design included HEC-11, HEC-14, HEC-15, and HDS-5 for flow conveyance, flexible lining, bend, and drop structure.
|
|
|
|
|
|
|
|
|