WilliamsEngineering,Inc.
  • Stormwater
  • Combined Sewers
  • Flood Waters
Stormwater Engineering:
Studies - Master Plans

WEI has performed many agency and watershed wide stormwater, floodwater, and combined sewer masterplans. Projects have been for cities, counties, drainage and flood control districts, and masterplanned communities.

Selected Projects


Combined Sewer Separation Master
Plan, Grand Junction, CO

Analyze 3.75 square miles of downtown
Grand Junction for separation of combined
sewers and stormwater management master
plan. Project involved modeling and analysis
of 10 subbasins with approximately 60,000 feet
of pipeline and $12,000,000 worth of
improvements. Masterplan required
coordination with the City, railroad company,
utility companies, and several state and
federal agencies.

Stormwater Management Masterplan,
Yuma County,
AZ
Gerald Williams, owner of WEI, was project
engineer on study involving stormwater and
groundwater for an 80 square mile area.
Coordination was required between three
municipalities, county, state, federal and other
agencies. Designed, analyzed, or supervised
work involving 14.6 miles of U.S.B.R. pipe and
22.5 miles of U.S.B.R. open channel drains, 585
drainage basins, 309 catch basins, 19 retention
basins, 36 pumps, 57,144 feet of existing storm
drain pipe, 168,840 feet of proposed storm and
groundwater pipe, and seven bridges.

City-Wide Floodplain Determination and
Stormwater Masterplan, Central City, CO
Performed hydrological and hydraulic study
which assessed existing conditions and
delineated floodplain areas for the entire
City, analyzed effectiveness of various
improvements, and prepared a cost-effective
improvement program, prepared proposed
condition floodplain maps, and prepared
application for a Letter of Map Revision
(LOMR). CWCB and FEMA were reviewing
agencies.


Grand Valley Stormwater Management
Master Plan, Grand Junction, CO
Prepared base mapping and provided
hydrological and hydraulic stormwater
analyses and master plans on five major
basins. Included 100 & 500 year
floodplain analyses on several washes,
drains, and creeks, involving bridges,
culverts, and 444 cross sections.

Fruita Stormwater Management
Master Plan, Fruita, CO
Prepared base mapping, hydrological
and hydraulic analyses, and stormwater
masterplan. Included 100 & 500 year
floodplain analyses on Little Salt Wash
involving 9 bridges and 110 cross
sections.

29 Road Drainage Master Plan, Grand
Junction
, CO
Performed hydrological and hydraulic
modeling and analyses and made
recommendations for regional drainage
facilities to be constructed as part of
the 29 Road Corridor Project.

Fairway Peaks, Flagstaff, AZ
Performed drainage design and analyses
for a master planned community involving
2,083 acres. Used HEC-1 and HEC-2
computer programs.

Orchard Mesa Stormwater Mgmt
Masterplan, Mesa County, CO
Performed hydrological and hydraulic
modeling and analyses and made
recommendations for regional drainage
facilities. This was an update of the
original masterplan prepared with the
Grand Valley SWMMP.

For more information, Contact Us.

Last Updated December 2006.