WEI has designed of many capital improvement sewer line extentions. Projects have included large diameter sewers, aerial lines over drainageways and rivers, open trench river crossings, both directional bore and jack and bore lines under highways, interstates, canals, rivers, congested utility corridors, and along trees and structures as protection. Designs include lift station design and abandonment, environmentally sensitive areas, and coordination and approval from state and federal agencies.
|
|
|
|
|
|
|
Design/Build Greenway Business Park Sewer Extension, Fruita CO Involved design of 4323 LF of 8" to 18" gravity sewer and 7362 LF of force main, a directional bore under a wash, preliminary evaluation and design of 5 lift stations and final design and state health department approval of 2 lift stations, one a recessed wet well mounted station, the other a dry pit with wet well. Both stations have variable frequency drives and web-based SCADA ethernet radio monitoring system and back-up power systems.
Appleton Sewerline Extension, Mesa County, CO Designed 2270 feet of sewerline in I-70 ROW and a 189 foot 30" diameter bore.
26 Road Area Sewer Improvement District, Grand Junction, CO Designed 8,051' sanitary sewer and 23 services to lots on septic. Crossed three canals and designed for soft soupy clay subgrade.
Hwy 6 & 50 Sewer Extension, Grand Junction, CO Designed sewerline extention along highway and designed a small package lift station.
|
|
|
|
|
New Sweden Sewer Interceptor, Bingham & Bonneville Cnty, ID Designed 20,113 feet of 12" to 21" sanitary sewer line including a 570' aerial force main river crossing, one bore under I-15 and one under the I-15 access road, and two bores under canals.
Limekiln Gulch Sewer Line Extension, Mesa County, CO Design of 2900 lineal feet of 8 inch sewer line, 500 lineal feet of 24" storm drain, and 500 lineal feet of roadway down a steep and narrow draw. Project also included abandonment of one lift station and the design of new lift station, all in environmentally sensitive area.
North Delta Sewer Phase 1, Delta County, CO Performed design of Phase I of the project, consisting of over a mile of 12" line, a crossing of a highway and the Colorado River, and a lift station.
Val Vista Lakes, Gilbert, AZ This involved the design of sewer facilities in virgin territory for an 800 acre development involving over 19 miles of sewer - if only all projects were so easy.
|
|
|
|
|
|
|
|
|